About this building

Morgan Stanley Clinical Building

The Morgan Stanley Clinical Building (MSCB) is the newest building at GOSH. Opened in 2012, it forms the first part of the Mittal Children's Medical Centre. This building has seven floors of modern inpatient wards for children with acute conditions and chronic illnesses, state-of-the-art operating theatres and the Clinical Investigations Unit and the Trust's restaurant (The Lagoon). Bear, Eagle, Flamingo, Koala and Walrus wards are situated in MSCB. This building is very efficient and the Energy Centre located on the roof provides efficient energy to half of the Trust's estate and will eventually provide energy for the whole site.

Our energy use

This graph allows everyone to access a range of data from Morgan Stanley Clinical Building. It's updated frequently, as we receive new data from the on-site meters.

Your Javascript is not enabled

Building Stats

  • Year Built2012

  • Number of floors10

  • Total usable floor area17735.0 m2

  • Heating TypeDistrict Heating

  • No. of Occupants

Display Energy Certificate

Since 9 January 2013 public buildings in the UK over 500m2 have been required to display a Display Energy Certificate (DEC) prominently at all times. Display Energy Certificates were introduced by the Government in response to the EU Energy Performance of Buildings Directive which all EU member states were required to implement by January 2009.

DECs are designed to promote the improvement of the energy performance of buildings. They are based upon the actual energy performance of a building and increase transparency about the energy efficiency of public buildings. DECs use a scale from A to G with A being the most efficient and G the least. The Display Energy Certificate for Morgan Stanley Clinical Building is available here or by clicking the plaque on the right.

Display Energy Certificate Rating F

Study our data

Morgan Stanley Clinical Building shares its sustainability data so that everybody can help to identify new savings and suggest improvements. The icons below show the utility data currently available for each year.

If you have ideas on how Morgan Stanley Clinical Building could use energy more efficiently, please let us know!

2017

  • Gas

  • Oil

  • Heat

  • Water

  • Solar

  • Wind

  • Rain

Download 2017 data

2016

  • Gas

  • Oil

  • Heat

  • Water

  • Solar

  • Wind

  • Rain

Download 2016 data

2015

  • Gas

  • Oil

  • Heat

  • Water

  • Solar

  • Wind

  • Rain

Download 2015 data

2014

  • Gas

  • Oil

  • Heat

  • Water

  • Solar

  • Wind

  • Rain

Download 2014 data